Thomas’s Home Makeover
The Thomas Home is very well built, but it was built in 1987. In the 80’s stained trim, stained cabinets and built-in benches on decks were verypopular. We replaced the deck in June of 2022, then we remodeled the1 st floor half bath in August of 2023. The half bath remodel set the tone for the interior of the home. The kitchen remodel was done in March of 2024.
Thomas Deck – Before 1 A – View from the right corner of the deck B – The deck is very weathered C – All the railing and 6” x 6” corner post will be removed D – The brick supports, for the deck, match the brick foundation of the house
Thomas Deck – Before 2 A – The steps will be removed (They do not meet current codes) B – There are no hand rails on the steps
Thomas Kitchen - After 10 A – The refrigerate is located beside the double window in the dining area B – A window seat is under the double window in the dining area C – Because the HVAC vent is located under the window seat, 2 vents are located in the front of the window seat
Thomas Deck – Before 1 A – View from the right corner of the deck B – The deck is very weathered C – All the railing and 6” x 6” corner post will be removed D – The brick supports, for the deck, match the brick foundation of the house